
Standard vs. upgrades in a new-build home: how to decide on changes
Standard specification is what the contract price includes; upgrades are paid for separately. The article explains which changes to decide on early, how to proceed, and what to check in the contract and financing.
The standard specification is the fitting-out included in the price of the flat under the contract and the technical specification. An upgrade is everything that differs from it and is paid for separately. When deciding on client changes, it is best to focus on what is difficult and expensive to change later (utility routes, layout, windows) and to postpone what can be added at any time (furniture, lamps, accessories). Always rely on the developer's specific specification, not on visualisations and the showroom.
What the standard is and where to find it
The standard of fitting-out is defined in a document that is usually an annex to the reservation or purchase contract. It is called the technical specification, the description of the standard or the materials book. It usually contains:
- the type of floor coverings and wall tiles in each room,
- sanitary ceramics, taps and, where applicable, the bath or shower enclosure,
- internal doors, door frames and the entrance door to the flat,
- the number and placement of sockets, switches and lighting points,
- the heating method, the type of radiators or underfloor heating,
- windows, shading and wall finishes (for example white paint, or only a base for it).
The text of the specification is what counts, not visualisations or the show flat. The show flat is usually furnished to an above-standard level and often contains elements that are not included in the price. If you are unsure, ask for written confirmation of which of the things you see are part of the standard.
What an upgrade and a client change are
An upgrade is a higher-grade variant of a material or item of fitting-out than the basic specification offers. Typically this means a different type of floor, larger-format tiles, a higher class of taps or doors with a different surface finish. A client change is a broader term: it also covers alterations to the layout, moving partition walls, shifting utility routes, additional sockets or modifying the ventilation.
The difference matters for a practical reason. Changing a material usually means just a different choice from a sample range. A change to the layout or technical routes, however, affects the design and can influence other parts of the building, so the developer assesses it individually and it is usually subject to a deadline.
Which changes are worth settling straight away
A simple question works well as a guide: how difficult and expensive will it be to change this once I have moved in? It helps to divide items according to what is built in and what is not.
Worth deciding before completion
- Layout and partition walls – moving or omitting a partition wall, the size of the walk-in wardrobe or bathroom.
- Electrical installation – the number of sockets, data cabling, connections for an induction hob, preparation for air conditioning or charging.
- Water and waste pipes – the position of the washbasin, bath or shower, connections for a washing machine and dishwasher.
- Heating – the position of radiators, or underfloor heating.
- Kitchen – the placement of connections according to the actual kitchen design.
Can be postponed until after moving in
- light fittings, curtains and shading accessories,
- freestanding furniture,
- painting in a different colour,
- bathroom accessories such as mirrors or shelves.
Floors and tiles are a borderline case. If you want a different material, it is generally simpler and cheaper to arrange it during construction than to remove an old floor later.
How to proceed when choosing changes
- Go through the specification. Mark what is standard and, for each item, note whether you intend to keep it in the future.
- Find out the deadline for changes. Developers usually set a deadline by which changes can be requested. After it, they are often impossible or significantly more expensive.
- Request a written quotation. It should include a description of the change, the price including VAT, the effect on the completion date and the method of payment.
- Compare with market prices. You can compare an upgrade item with what it would cost if carried out separately after taking over the flat. Sometimes your own tradesperson is cheaper, and sometimes a change made during construction is more advantageous.
- Have the changes confirmed in an addendum. Verbal agreements with a sales representative or site manager are not enough.
Financial and legal considerations
Client changes increase the total purchase cost, and this may affect financing. A mortgage bank usually assesses the price according to the contract and the valuation of the property. The additional costs of upgrades may therefore not be fully covered by the loan, and you may have to pay part of them from your own funds. Check this with a mortgage specialist before signing an addendum.
You can get an approximate idea of monthly repayments and total costs in our calculator. Include the expected costs of changes in it as well.
In the contract, pay attention to the following points: when and in what instalments the upgrade is paid, what happens if the contract is cancelled or you withdraw from it, how any delay in the completion date caused by the changes is handled, and who is responsible for defects in the work carried out. We recommend consulting the exact wording with a lawyer who specialises in property purchases.
General information about the whole process, from reservation to handover, can be found in the buyer's guide.
How to compare offers from different developers
Two flats with a similar price per square metre may have a completely different standard. When comparing, therefore, do not compare only the price but also the content of the specification. Focus on whether the price includes a fitted kitchen, floors in all rooms, tiles, sanitary ware and internal doors, or whether you have to arrange them yourself.
Browse the offer in the project catalogue and narrow down your selection by location and fitting-out. Information about individual companies can be found in the overview of developers, or you can compare different locations. If you are not sure what to do, you can use the housing inquiry form and have offers prepared according to your requirements.
Frequently asked questions
Can I swap a standard item for another without an extra charge?
It depends on the developer. Some companies allow a choice from several variants within the standard, while others work with a fixed specification. It is advisable to have any price difference between the variants confirmed in writing.
Is it better to have changes made by the developer or after taking over the flat?
Changes that affect structures and utility routes are usually worth arranging with the developer. Surface finishes and fittings can often be arranged more cheaply separately after handover, but you need to allow for the time and for coordinating the tradespeople.
Can I cancel an upgrade if my financial situation changes?
The options follow from the addendum and the contract. As a rule, the closer a change is to being carried out, the harder it is to cancel, and deposits already paid may not be refundable. Check the terms before signing and, if anything is unclear, consult a lawyer.
Prices are in Czech crowns (CZK) as published by developers; please verify current availability with us. Some linked pages (calculator, developer profiles) are only in Czech.
Find a new build within your budget
See the results right away, no contact details needed.
Looking for a new-build home in the Czech Republic?
Tell us what you are looking for. A specialist will send you a personal selection of projects within 24 hours, check current availability with the developer and arrange viewings. Free and without obligation.


